Use AI to improve maintenance planning, reliability engineering, and equipment performance with this dual-level prompt pack. Supports preventive, predictive, and corrective strategies across operations.

Explore full site content options  |  Free Prompt Pack Samples

Jump to Basic Prompts | Jump to Advanced Prompts


Basic Prompts (50)

  • Preventive Maintenance Program Development
  • Equipment Reliability Analysis
  • Work Order Management System
  • Spare Parts Management
  • Condition-Based Maintenance Implementation
  • Maintenance Planning and Scheduling
  • Equipment Lubrication Program
  • Root Cause Analysis for Equipment Failures
  • Maintenance Key Performance Indicators (KPIs)
  • Maintenance Safety Program
  • Computerized Maintenance Management System (CMMS)
  • Maintenance Training and Skill Development
  • Equipment Criticality Assessment
  • Vibration Analysis Program
  • Maintenance Cost Management
  • Equipment History and Documentation
  • Thermographic Inspection Program
  • Maintenance Shutdown Management
  • Oil Analysis Program
  • Maintenance Workforce Management
  • Equipment Procurement and Installation
  • Maintenance Quality Assurance
  • Energy EfÞciency in Maintenance
  • Maintenance Contractor Management
  • Equipment ModiÞcation and Upgrade Management
  • Maintenance Materials Management
  • Failure Analysis and Investigation
  • Maintenance Environmental Management
  • Equipment Cleaning and Preservation
  • Maintenance Technology Integration
  • Reliability Engineering Implementation
  • Maintenance Benchmarking and Best Practices
  • Maintenance Continuous Improvement
  • Asset Management Strategy
  • Maintenance Communication and Coordination
  • Maintenance Data Management
  • Equipment Warranty Management
  • Maintenance Risk Assessment
  • Tool and Equipment Management
  • Maintenance Performance Reporting
  • Maintenance Emergency Response
  • Maintenance Lean Implementation
  • Total Productive Maintenance (TPM)
  • Maintenance Project Management
  • Maintenance Inventory Optimization
  • Maintenance Budget Planning

Advanced Prompts (25)

  • Multi-Stakeholder Asset Performance Analysis (Multi-Perspective)
  • Contextualized Predictive Maintenance Program Design (Context-Rich Prompting)
  • Reliability Engineering Executive Advisor (Role-Based & Persona-Driven)
  • Personal Maintenance Expertise Calibration (Personal Calibration)
  • Sequential Reliability-Centered Maintenance Implementation (Multi-Step & Chained
  • Condition Monitoring Technology Selection (Few-Shot Prompting)
  • Root Cause Analysis Reasoning (Chain-of-Thought Prompting)
  • "First, I'm analyzing the failure description to understand the failure mode
  • "Next, I'm examining the timeline and operating conditions because this helps
  • "Then, I'm applying systematic investigation methods: Physical evidence
  • "Now I'm using the 5 Whys technique step-by-step: Why did the failure occur?
  • "Looking at this through FMEA lens: Potential causes include... The most
  • "Considering human factors: Training issues... Procedural gaps...
  • "Evaluating systemic issues: Design adequacy... Maintenance strategy...
  • "My hypothesis ranking is... with evidence supporting... and confidence levels
  • "Therefore, my recommended corrective actions are prioritized as...
  • Maintenance Strategy Validation (Self-Consistency)
  • Asset Management Program Design (Meta-Prompting)
  • What key asset information do you need from me to provide the most valuable
  • Which asset management frameworks (ISO 55000, PAS 55, etc.) would be most
  • What potential gaps or blind spots should we watch for in the analysis?
  • How should we structure the assessment to be most actionable for
  • What follow-up data should I be prepared to provide?
  • What would make this asset management program superior to typical
  • Equipment Optimization Pathways (Tree of Thoughts)